Tuesday, August 19, 2003
This was done so that I would be home in time for a doctor's appointment
tomorrow. So I couldn't really blame Yancy for the short miles, though that was
my first impulse. No, I chided myself. You were going to give him a
chance.
Wednesday, August 20, 2003
The doctor, looking me over after being on the job for a few days, decided I
was all right except for the space between two lumbar vertebrae. He promptly
made an appointment with a surgeon, which I will have to decide whether to keep.
I've never met a person who had spinal surgery and ended up happy about it. The
appointment was hard to get and is set for early next month, so, meanwhile, I
get to drive and, hopefully, get a lot of miles!
Thursday, August 21, 2003
I got to my truck before 7 AM, as instructed, and found there was not yet an
assignment waiting for me. I did a pre-trip inspection, hoping a trip would
follow. Finally, at 11:30, one came in. A long trip? No. I had to drive about
fifty miles to Casa Grande to pick up a load of potato chips, and deliver it to
Rancho Cucamonga, around the corner from Fontana. At least, it was a no-touch
load—pick up loaded and drop off the still-loaded trailer—so it wasn't a real
time waster. I made it to the consignee well before midnight, and pulled into
the Fontana Operating Center to spend the night. Total for the day: 446 miles.
Friday, August 22, 2003
And today I was asked to bring my truck in for a PM (Planned Maintenance).
The appointment was for 4 AM, so it had been agreed that I could spend the night
at a motel. My truck was supposed to ready at 10:00 AM, and I already had an
assignment—but the repairs (of course) ran late. The completion time was advanced to noon,
then one, then two. By then, the load I had been assigned was in danger of
arriving late, even though it was a mere 16-mile run, completing a relay in
which I took a trailer from Fontana to the neighboring town, Ontario. By now it
was so late in the day, that I had to fight L.A. city traffic on my way to the
next pick up, a load going to the Sacramento area. I had been up all day,
waiting, and was already tired even though I hadn't driven very much. So I took
a nap at the Los Angeles Maintenance Facility. Miles for the day: 53.
Saturday, August 23, 2003
At quarter-past midnight, knowing the traffic would now have eased, I ended
my nap and drove as far as I could to get out of the city. That got me over the
steep Grapevine grade and to Arvin before I shut down for the night.
In the morning, I continued on to Lathrop to drop my load. I then bobtailed
all the way to Stockton to pick up a loaded trailer from the rail yard there.
The load was going to Reno, and I got to the consignee just before midnight.
And of course, the directions to the consignee were wrong. I sent in a correction
to the directions department and, as he had requested, a copy to Yancy. He
wouldn't be in until Monday, of course; but I prefixed his name to the message
and, hopefully, he would get it then.
And, my work assignment said this was a live unload. That means, I would have
to back up to a dock and wait while the trailer was unloaded. My next
assignment, in fact, required me to have the empty with me. But the consignee
wasn't, in fact, open. There was a security guard there, no more. She allowed me
to drop the load, which was really the only possibility since the facility would
also not be open until Monday. I spent the night at Alamo Joe's truck stop. A
550-mile day! See, it is (almost) possible!
Sunday, August 24, 2003
Today's run was another short one, from Reno to Fresno. The assignment ended
in a Monday morning appointment in Fresno. I called customer service, attempting
to arrange for a relay so I could do more than 5 1/2 hours of driving today, but
was told there was no freight. So I drove to the Pilot truck stop in Madera for
the night. That placed the consignee less than an hour away.
At the Pilot, I spotted five Schneider trucks bobtailed. That meant
they, too, had no loads. But there were several Schneider trailers that came and
went through the fuel islands. Every one was pulled by a Schneider
owner-operator truck, identifiable because they were colors other than
orange. I spoke to one of the owners as he fueled.
Looks like you've got a load,
I said, nodding at the trailer. Most of the
Schneider trucks here are bobtailed.
He followed my gaze into the parking lot and nodded. Yeah,
he agreed.
Schneider always gives the owner operators first pick of the loads. We have to
be able to make our truck payments to them, don'cha know!
Still, he'd had to work around a doctor appointment and a PM, neither of
which he scheduled. (The PM occurs automatically when the truck reaches a
specified mileage.) So I decided to grit my teeth and give him another week.